| Broken China Farm | |||||
|
OCTOBER
Installation of metal roof begins.
Openings in south wall at upper level
View toward entry
Area over entry at upper floor.
Layering of wood members at eave.
Plywood roof sheathing goes on at Barn.
Device to ensure accurate installation of 8" long roof screws into exposed roof trusses below, (built on site).
|
|||||